Several tasks, some simple, some a pain-in-the %&*$#, got done over the past few weeks:

shock3.JPG (17521 bytes)

What's Next?

The side mount muffler and its mounting hardware arrived from California Power Systems, so that will be next. Once that is done and the Digipod instrument pod is mounted we will be ready to do the hang-test. After that, a short session of tank plumbing should have us ready for engine start. Once past that, some control rigging is all that should remain prior to the first taxi tests.